One story building with two Cafeterias (Student and Faculty cafeterias)
Worked on the project from the Schematic phase to the Construction
phase.
Responsible for site investigation, defining the demolition scope,
calculations, design, equipment sizing and selection, specifications,
coordination with other disciplines and consultants